Bambang R. M. Setyohadi Kp, Dimas Wicaksono
The poverty is one of the prevailing problems in Indonesia until now. Even a change of the era of governance has not succeeded in eradicating the problem of poverty. The program of poverty alleviation program has always been a focus in the budget allocation in all era of leadership in Indonesia. Those programs were strategic because it prepared the foundation of community self-reliance in the form of representative, entrenched and conducive community leadership institutions to develop of social capital of society in the future. Developing an area of the village requires an integrated planning (Grand Design) to figure out the potential and the problems existing in the rural area as well as the integration of the rural area surrounding. In addition, the grand design needs to be synchronized to the more comprehensive spatial plan with a hierarchical structure such as RTBL, RDTRK / RRTRK, RTRK, and RTRW. This rural area management plan can be oriented or refer to the pattern developed from neighborhood Development program which is part of the PNPM Mandiri program. The neighborhood development program is known as residential area development plan whose process involves of the entire community. Therefore, the regional development up to the scale of the environment requires the planning phase. Particularly, spatial planning which emphasizes the efforts to optimize sectorial development targets to be integrated into an integrated development process must be conducted, in addition to taking into consideration the opportunities, potentials and limitations of the resources, the level of interconnection with the central government within the district and between sub-districts and rural areas. © 2018 Author(s).
Department of Civil Engineering, Faculty of Engineering, Universitas Negeri Semarang, Semarang, Indonesia